1.
CONTACT OUR TEAM
Custom glass is ordered to verified dimensions with holes, hinge notches and edge finishing specified in advance. We coordinate fabrication with qualified suppliers.
Glass Project Solutions Ltd. supplies and installs West Kelowna glass shower doors for renovations, custom bathrooms and new homes. Options include frameless hinged doors, sliding glass panels, framed systems and tub shields. We consider finished tile openings, wall supports, door swing and splash control before recommending a configuration. Our projects serve Westbank Centre, Shannon Lake, Rose Valley, Lakeview Heights, Glenrosa and Smith Creek.
Frameless hinged doors offer clean sightlines with minimal framing. Many designs use 10 mm tempered safety glass, subject to panel dimensions and hardware limits. We verify hinge anchorage, door swing, fixture clearances and curb geometry before confirming the design.
Frameless sliding doors work well where a swinging panel would interfere with nearby fixtures. Tracks and rollers must be rated for the panel weight and allow adequate access for cleaning and maintenance.
Bypass systems use overlapping sliding panels and suit many wider shower openings. We consider usable entry width, handles, track height and shower spray direction.
Framed hinged shower doors combine metal profiles with practical swing operation. Frame finishes, door clearances and gaskets are selected for the finished opening.
Framed sliding doors can provide a compact solution for alcove showers and some bathtub layouts. Correct track and roller alignment helps ensure reliable movement.
Glass tub shields offer a modern alternative to full curtains. Fixed or hinged options depend on tub dimensions, wall support and expected spray direction. Open shields cannot guarantee complete splash containment.
Precise measurements are taken after tile and surrounding finishes are complete. We check wall plumb, curb slope and hinge positions to avoid oversized gaps or stressed glass.
Bathroom hardware must tolerate moisture and repeated use. We specify compatible corrosion-resistant hinges, handles and rollers and explain basic maintenance.
Related resources: Glass Project Solutions Ltd.
Shower door layouts can be adapted to alcove, corner and selected angled openings. Clear, frosted and textured glass options provide different privacy levels. Hardware finishes and handles complete the design.
Custom glass, hinges, tracks and brackets must work together as a system. We review opening dimensions, panel weight, edge finishing and hardware compatibility before ordering.
Tempered safety glass is commonly used for shower doors. Thickness, cutouts and finished edges are specified before fabrication because tempered panels cannot normally be cut or drilled afterward.
Shower door installations should comply with applicable BC Building Code provisions and relevant product specifications. We verify safety glass and support requirements for the specific opening.
Safety glass selection depends on the door type and hardware rating. Glass thickness alone does not establish whether a complete assembly is suitable.
Hinged and sliding doors need suitable clearances, reliable support and correct adjustment. We inspect potential contact points to reduce the risk of glass impact.
Wall blocking, tile condition and hinge anchorage affect performance. For heavier frameless doors, we discuss support requirements with the renovation contractor before fabrication.
Handles and visible fittings help people identify and operate clear glass doors. We also consider door swing and contact with adjacent fixtures.
Where accessible shower entry is required, the clear opening and door operation must be coordinated with the bathroom’s overall accessibility design.
Custom glass is ordered to verified dimensions with holes, hinge notches and edge finishing specified in advance. We coordinate fabrication with qualified suppliers.
Our process includes consultation, measurement, quotation, procurement, installation and final inspection. Shower waterproofing and broader bathroom renovation work remain separate unless expressly included.
Share photographs, approximate dimensions and whether you prefer a hinged, sliding, framed or frameless door. We can discuss suitable configurations.
Your quotation identifies the glass, hardware, finishes, installation scope and any required site preparation.
After approval, we coordinate product lead times and installation access. Finished tile and necessary support preparation should be completed before final measurement.
We verify the completed opening, curb slope, tile alignment and hinge supports. Critical dimensions are confirmed before custom glass is ordered.
Our installers fit the selected hinges or tracks, position the glass and adjust door operation. We check seals, clearances and secure fittings.
We clean the area, review door operation and explain practical water-management limitations for partially open designs.
Use a squeegee and non-abrasive cleaner to reduce mineral buildup. Keep hinges, rollers and tracks clear of soap residue. If a panel shifts, binds or leaks persistently, request professional inspection rather than forcing the door.
Planning glass shower doors in West Kelowna? Contact Glass Project Solutions Ltd. to request a quotation for a custom frameless, framed, hinged or sliding shower door.